Hospitality · Residential · Commercial
Furniture and finishes,
direct from the line.
We manufacture for importers, distributors and fit‑out contractors — from a single hotel room package to 120 apartment kitchens. No trading layer. No catalogue theatre.
A factory that answers the question buyers actually ask.
Most suppliers send a catalogue and a promise. We send the four numbers that decide whether a project is viable: packing quantity per container, landed unit cost, certificate status for your market, and lead time with a tolerance.
Six production lines in Foshan, sixty to eighty containers a month, and a QC report that leaves with every load — traceable to a batch and a checkpoint.
ZB‑SW‑09
Bathroom vanity set
- BasinSingle‑fired ceramic
- Per 40HQ≈450 sets
- Lead25–30 days
ZB‑OD‑05
Outdoor collection
- TestSalt spray 500 h
- FramePowder‑coated aluminium
- Per 40HQ≈220 sets
ZB‑AW‑11
Aluminium window
- ProfileThermal break
- GlassLaminated option
- Lead30–40 days
Mexico · Hospitality
180‑key hotel, Cancún
Full guest‑room package — bed frames, wardrobes, desks, luggage racks. Forty‑five days production, two containers per shipment.
Saudi Arabia · Residential
120‑unit apartment fit‑out
Kitchen cabinetry and wardrobe systems, flat‑packed for local assembly. Freight volume reduced by a third.
UAE · Commercial
Retail flagship, Dubai
Display fixtures, counters and back‑of‑house joinery. Fifteen‑day installation window, met.
Client names withheld under NDA. References and factory contacts available on request.
“They sent the loading photos before the invoice. That is when we stopped comparing prices.”Placeholder testimonial — replace with a real client, name and market
The four things that decide whether a container arrives clean.
- BoardDensity, thickness tolerance and formaldehyde grade checked per batch — not per year.
- Edging2 mm ABS on exposed edges, peel‑strength tested. Edge lift is the first complaint in Gulf and coastal climates.
- AssemblyOne in twenty units dry‑assembled before packing. Misaligned holes become your installer's charge‑back.
- LoadingFive‑layer corrugated, corner protectors, moisture barrier — and a photo set of every container.
Every shipment leaves with a QC report and a loading photo set traceable to batch and checkpoint. Claims are answered against that evidence, not against opinion.
What is your minimum order?
One 20GP mixed container, or one 40HQ for a single‑family order. Mixed containers are normal here — a hotel project usually needs bedroom, seating and bathroom in one load.
How long is production, honestly?
25–30 days after deposit and artwork approval, ±3 days. Peak season, August to November, runs 35–40 days. Anyone quoting fifteen days on custom furniture is either holding stock they haven't declared, or guessing.
Payment terms?
30% deposit, 70% against B/L copy. L/C at sight for first orders above USD 50,000. We do not ship first orders on open account — and you should be wary of suppliers who offer to.
Can I see a sample before committing to a container?
Yes. 7–10 days for a sample; the cost is credited against your first container. Tile sample boards are free, courier at your account.
Do you handle Saudi certification?
Yes — SABER PCoC and SCoC are issued before loading, and the certificate numbers travel with the B/L copy. Since 2026 the commitment‑letter route is closed and Fasah is linked to SABER, so this is no longer negotiable.
Enquiries
Tell us the room,
the quantity, the port.
Five fields. A person replies — usually the same day, always within twenty‑four hours. You get a matched list and a CIF price, not a catalogue attachment.
For document requests, use the certificate page.