ZHONGBANGFoshan · China

Home / Solutions

Buy by the room, not by the SKU.

Buyers do not search by material. They search by the space they have to finish by a date. These are the five we build for.

Hotel guest rooms

01

Hotel guest rooms

A room package, not a product list.

A 120-key hotel needs the bedroom set, wardrobe, bathroom vanity and tile to arrive together and match. We plan the packing split per floor so your installer opens one crate per room.

Typical order120–300 keys
Lead time25–35 days
PackingPer room, numbered

Typical mix

  • ZB-HB-01 bedroom package
  • ZB-WD-02 wardrobe
  • ZB-SW-09 vanity set
  • ZB-PT-06 floor tile
  • ZB-WT-08 wall tile

Enquire about this type →

Serviced apartments

02

Serviced apartments

Flat-pack economics at scale.

Apartment schemes live or die on freight volume. Flat-packed wardrobes and kitchens cut container count by around a third against assembled units — usually the single biggest saving in the project.

Typical order60–400 units
Lead time30–40 days
Saving≈30% freight volume

Typical mix

  • ZB-WD-02 wardrobe
  • ZB-KC-03 kitchen cabinetry
  • ZB-PT-06 floor tile
  • ZB-SW-09 vanity set

Enquire about this type →

Villas & resorts

03

Villas & resorts

Outdoor furniture that survives the coast.

Salt air destroys standard finishes within two seasons. Aluminium frames are salt-spray tested 500 hours and cushions are specified for drying behaviour, not just appearance.

Typical order20–120 villas
Lead time30–40 days
TestSalt spray 500 h

Typical mix

  • ZB-OD-05 outdoor collection
  • ZB-SF-04 contract seating
  • ZB-AW-11 aluminium window
  • ZB-PT-07 large-format tile

Enquire about this type →

Retail & F&B

04

Retail & F&B

Fit-out windows are short. Ours are predictable.

Retail projects run on opening dates, not on production convenience. We quote a fixed loading date and build backwards from your installation window.

Typical order1–20 sites
Lead time25–35 days
ConstraintInstallation window

Typical mix

  • ZB-SF-04 contract seating
  • ZB-PT-07 large-format tile
  • ZB-AD-12 entrance door
  • ZB-HB-01 custom joinery

Enquire about this type →

Office & co-working

05

Office & co-working

Durability over appearance.

Co-working furniture is specified for the third refit, not the first photograph. Replaceable covers and contract-grade foam keep the asset usable.

Typical order500–3,000 m²
Lead time25–35 days
FocusService life

Typical mix

  • ZB-SF-04 contract seating
  • ZB-KC-03 pantry joinery
  • ZB-WT-08 wall tile
  • ZB-AW-11 glazing systems

Enquire about this type →